This project is currently Under Development


Water / Wastewater


Presidio, Texas, USA

Benefited Population

1,638 people

Projected Cost

$875,000.00 USD


City Administrator, City of Presidio Texas



The Colonia of Las Pampas does not have basic water services, the project will construct the basic infrastructure needed to allow the city to provide services. New water supply lines, a booster station, and pressure tank will be constructed to supply the Las Pampas area. The project will include a new 300,000 gall water storage tank, which is needed provide duplicity in the water system.