This project was Certified on November 09, 2017

Sector

Water / Wastewater

Location

Tijuana, Baja California, MEX

Benefited Population

86,950 people

Projected Cost

$3,014,000.00 USD

Sponsor

CESPT

ID#

867

The proposed Project consists of the rehabilitation of approximately 4,193 linear meters (13,756.6 ft) of the Collector Poniente. The Project has been designed in three consecutive segments, described as follows: • Segment 1: 1,086 meters (3,563 ft) of 42-inch diameter pipe; • Segment 2: 789 meters (2,588.6 ft) of 42-inch diameter pipe; and, • Segment 3: 2,318 meters (7,605 ft) of pipe ranging from 18- to 42-inches in diameter. The Project also includes the replacement of approximately 310 meters (1,017 ft) of sewer laterals connected to the Collector Poniente, with diameters ranging from 8 to 12 inches.

    Certification Document