This project was Certified on June 19, 2018

Sector

Water / Wastewater

Location

Jose Silva Sanchez, Tamaulipas, MEX

Projected Cost

$260,000.00 USD

Sponsor

COMISIÓN MUNICIPAL DE AGUA POTABLE Y ALCANTARILLADO DE SOTO LA MARINA

ID#

850

The proposed project consists of the construction of a drinking water system, including the installation of a new waterline, storage tank and distribution system, as well as equipping an existing well with a new power connection, pumping equipment and disinfection to provide first-time water service to the community of José Silva Sánchez in the municipality of Soto la Marina, Tamaulipas